Summary

 

This dam, as the highest of embankment type (182m) in Iran, is a Clay Core Rockfill Dam with a volume of 4.5 billion CUM. The dam body and sealing the foundation (cut off wall) and headrace tunnel are completed and construction of the spillway and sealing operation of galleries have also been finished.

 

Gallery

  • got1
  • got2

Spillway & Body and Waterway System of Gotvand Olya Dam Project

 

 

Spillway & Body and Waterway System of Gotvand Olya Dam Project

 

Location:

25 km North West of Shooshtar City, Khuzestan Province

Authorities:

Employer: Iran Water and Power Resources Development Company

Consultant Engineers: Mahab Ghodss Consulting Engineer Company

Contractor: Sepasad Group

 

Objectives:

1- Annually Generating Electricity Power in 4500 GW (capability to increase up to 2000 MW)

2- Controlling Seasonal Floods & Discharged Waters from Upstream Dams

3- Regulating Downstream Water-flow for Agriculture at Khuzestan Plain

4- Tourism Attractions

 

 

 